Dubai Metro Blue Line: two ways to read the 30 km plan
RTA plan as cited in the 2026 guide
The route split describes two directions; the underground split describes construction. The bars each add to 30 km and should not be added together.
Methodology
Compares two classifications of the same 30 km plan. No inference about underground length on either individual direction.
Read chart data
| Comparison | Longer direction | Shorter direction | Underground | Above ground |
|---|---|---|---|---|
| Direction split | 21.00 | 9.00 | 0.00 | 0.00 |
| Construction split | 0.00 | 0.00 | 15.50 | 14.50 |